3000 Minuteman Road

3000 Minuteman Road v.3

Category:  Under Review (SP22-01 & SP22-02); Permitted (SP22-03 & SP22-07) 

Plan/File Number: SP22-01, SP22-02, SP22-03 & SP22-07

Applicant: ARE-MA Region No 93 Phase 2 Holding, LLC

Project Description: The current development proposal consists of a renovation of the existing building (Building 1, Lot 1) and a 100,000 s.f. addition to be used for therapeutic drug development and cGMP compliant manufacturing, and related parking adjustments, and a renovation of more than 40% of the gross floor area of the existing 171,200 s.f. building (Building 3, Lot 2) and related parking adjustments.

Applicant Submittal

  1. Major Non-Residential Project Special Permit Application (Building 1, Lot 1)
  2. Reduction in Parking Special Permit Application (Building 1, Lot 1)
  3. Project Narrative & Appendices (Building 1, Lot 1)
  4. Plan Set (Building 1, Lot 1)
  5. Major Non-Residential Project Special Permit Application (Building 3, Lot 2)
  6. Reduction in Parking Special Permit Application (Building 3, Lot 2) 3.1.22
  7. Plan Set (Building 3, Lot 2)
  8. Parking Allocation Plan (Building 3, Lot 2)
  9. Phase 1 Utility Assessment (Building 3, Lot 2)
  10. Transportation Impact Assessment - Phase 1 Redevelopment 1.25.22
  11. Transportation Impact Assessment - Building 1 Redevelopment 2.17.22
  12. Transportation Impact Assessment - Building 3 Lab/cGMP Conversion 2.17.22
  13. Transportation Impact Assessment - Initial Campus Redevelopment 3.17.22
  14. Horsley Witten Group Initial Stormwater Peer Review 3.23.22
  15. SMMA Response to Initial Stormwater Peer Review 4.15.22
  16. Reduction in Parking Special Permit Application (Building 3, Lot 2)
  17. Operation & Maintenance Plan 4.12.22
  18. Revised Plan Set 4.12.22
  19. Horsley Witten Group Second Stormwater Peer Review 4.19.22
  20. Revised Transportation Impact Assessment - Initial Campus Redevelopment 6.10.22
  21. Environmental Partners Traffic Peer Review 7.8.22
  22. Applicant Response to Environmental Partners Traffic Peer Review 7.15.22
  23. Environmental Partners Response to Comments Review 7.25.22
  24. Applicant Follow-up Response to Environmental Partners Traffic Peer Review 8.8.22
  25. EENF MEPA Filing 8.1.22
  26. MassDOT EENF Comments 9.9.22
  27. Conceptual Campus Plan
  28. Methods for Control of the Oriental Bittersweet Plant Specie 9.8.22
  29. Site Layout and Circulation Memorandum 9.8.22
  30. Woodard & Curran Hydraulic Analysis Review 9.9.22