3000 Minuteman Road
Category: Permitted (SP22-01 & SP22-02); Permitted (SP22-03 & SP22-07)
Plan/File Number: SP22-01, SP22-02, SP22-03 & SP22-07
Applicant: ARE-MA Region No 93 Phase 2 Holding, LLC
Project Description: The current development proposal consists of a renovation of the existing building (Building 1, Lot 1) and a 100,000 s.f. addition to be used for therapeutic drug development and cGMP compliant manufacturing, and related parking adjustments, and a renovation of more than 40% of the gross floor area of the existing 171,200 s.f. building (Building 3, Lot 2) and related parking adjustments.
Applicant Submittal
- Major Non-Residential Project Special Permit Application (Building 1, Lot 1)
- Reduction in Parking Special Permit Application (Building 1, Lot 1)
- Project Narrative & Appendices (Building 1, Lot 1)
- Plan Set (Building 1, Lot 1)
- Major Non-Residential Project Special Permit Application (Building 3, Lot 2)
- Reduction in Parking Special Permit Application (Building 3, Lot 2) 3.1.22
- Plan Set (Building 3, Lot 2)
- Parking Allocation Plan (Building 3, Lot 2)
- Phase 1 Utility Assessment (Building 3, Lot 2)
- Transportation Impact Assessment - Phase 1 Redevelopment 1.25.22
- Transportation Impact Assessment - Building 1 Redevelopment 2.17.22
- Transportation Impact Assessment - Building 3 Lab/cGMP Conversion 2.17.22
- Transportation Impact Assessment - Initial Campus Redevelopment 3.17.22
- Master Plan Concept 3.8.22
- Horsley Witten Group Initial Stormwater Peer Review 3.23.22
- SMMA Response to Initial Stormwater Peer Review 4.15.22
- Reduction in Parking Special Permit Application (Building 3, Lot 2)
- Operation & Maintenance Plan 4.12.22
- Revised Plan Set 4.12.22
- Horsley Witten Group Second Stormwater Peer Review 4.19.22
- Revised Transportation Impact Assessment - Initial Campus Redevelopment 6.10.22
- Environmental Partners Traffic Peer Review 7.8.22
- Applicant Response to Environmental Partners Traffic Peer Review 7.15.22
- Environmental Partners Response to Comments Review 7.25.22
- Applicant Follow-up Response to Environmental Partners Traffic Peer Review 8.8.22
- EENF MEPA Filing 8.1.22
- MassDOT EENF Comments 9.9.22
- Conceptual Campus Plan
- Methods for Control of the Oriental Bittersweet Plant Specie 9.8.22
- Site Layout and Circulation Memorandum 9.8.22
- Woodard & Curran Hydraulic Analysis Review 9.9.22
- Environmental Partners Traffic Peer Review Amendment #2 9.13.22
- Department of Public Works Memorandum 10.7.22
- Applicant Response to Department of Public Works 10.10.22
- Water Main Feed One-Line Diagram