The Department of Public Works is excited to be continuing the improvements of several water mains throughout town. Work began the week of March 22nd.
The project areas include the following streets:
- Linwood Street
- Rock O Dundee Road
- Castle Heights
- Joyce Terrace
- Elm Street
- Walnut Ave
- Carmel Road
- Lockway Road
- Linda Road
- Suncrest Road
- Smithshire Estates
- Beech Street
- Shawsheen Road
- Cuba Street
- Red Spring Road
- Moraine Street
- North Main Street
- Stevens Street
- Railroad Street
- Essex Street
- Ridge Street
- Pearson Street
- Rocky Hill Road
- Phillips Street
Update: Water main work on Shawsheen Road will require a detour from Smithshire Est to Stevens St, starting Wednesday, July 28th. This road will be detoured between the hours of 7 am and 5 pm, with the detour lasting approximately 2 weeks.
The construction may require some adjustments in neighborhood driving patterns; however, every effort will be made to minimize this inconvenience. There may be detours and delays. Local traffic and school buses will be allowed to access residences. Emergency vehicles will not be prevented from responding to calls.
There will be planned water main shutdowns, for which notices will be distributed to affected residents and businesses beforehand. We would like to thank you for your cooperation during these projects. For questions or concerns, please contact the Engineering Division at 978-623-8770 or dpw-engineering@andoverma.gov.