News Flash Home
The original item was published from 4/12/2017 2:46:50 PM to 4/12/2017 2:47:18 PM.

News Flash

Project News and Updates

Posted on: April 14, 2017

[ARCHIVED] Water Division Fire Flow Test

The Town of Andover Water Division  will be conducting two Fire Flow tests on Saturday, April 15, 2017.

The first will begin at 8:00 a.m. at 8 CONNECTOR ROAD.  Water may be discolored for a period of time in the CONNECTOR ROAD, LOWELL JUNCTION, and RIVER STREET AREAS.

The second test will begin at 10:00 a.m. at 4 CORPORATE DRIVE.  Water may be discolored for a period of time in the CORPORATE DRIVE, SHATTUCK RD., RIVER RD., and CHANDLER RD AREAS.

To help alleviate the discoloration problem, please run your outside faucet(s) until the water clears.

Facebook Twitter Email

Other News in Project News and Updates